ChargeLink Native

Capability Boundaries

This page states what ChargeLink Native does and the limits and requirements that apply to each capability. Read it before you build a procedure or a report on ChargeLink output, so that every result is described within what the software actually does.

Main use case. ChargeLink runs ISO 15118-20 DC charging with external identification (EIM), in the charger and the vehicle role, in Scheduled and Dynamic control mode, on a Windows bench with NI VeriStand 2024 and a simulated power stage. The IEC 61851-23/-24 System A station and EV roles run on a virtual or Kvaser CAN bus with a simulated plant. The ISO 15118-2 and DIN 70121 DC EIM roles are built and loopback-tested engineering lanes. Every other function on this site is an engineering and test-development tool of the same binary. None of them is a certification, conformance or interoperability statement; no physical charging interface (power-line communication, control pilot, power stage) is included.

Charging protocols

AreaWhat ChargeLink doesLimits and requirements
ISO 15118-20 EVSE, DC EIM, plant-coupledRuns the charger side of a full DC EIM session. Every response is computed from the session state and the plant model measurements.Requires the NI VeriStand bench of the package. Scheduled and Dynamic control mode, selected by the EV from the modes the runtime profile offers (control_mode, parameter_set_control_modes); the package's runtime profile offers Scheduled with one 60 s charging schedule. Schedule renegotiation is answered when the EV requests it; the SECC never triggers it. Dynamic mode: MobilityNeedsMode 1 only, pricing 0 only, no SECC-initiated pause or standby, available power from a profile script. CableCheck is simulated by the plant model. TLS 1.3 mutual authentication is required. A failed request is answered with a FAILED response code.
ISO 15118-20 EVCC, DC EIM live sessionRuns the vehicle side of a full DC EIM session against a charger.Requires the EV case file and the session manifest delivered with the package, passed through environment variables; TLS 1.3 mutual authentication; --max-steps 14. The EV values are test values, not a vehicle implementation.
ISO 15118-20 TLSTLS 1.3 with mutual authentication and the ISO 15118-20 Annex B certificate profile.Both roles offer and accept only the named groups secp521r1 and x448 (order set by --iso20-curve-profile, default secp521r1) and the cipher suites TLS_AES_256_GCM_SHA384 and TLS_CHACHA20_POLY1305_SHA256, with no session tickets or resumption. A peer that offers neither group (for example a P-256-only peer) is refused before any V2G message; --allow-legacy-tls-named-groups adds secp256r1 last for such peers and is recorded as a legacy claim boundary. The charger and the vehicle must be from the same release: mixed versions fail closed.
ISO 15118-20 EVSE reference responder (DC, AC, BPT)Answers an external vehicle with validated reference responses per message. For engineering and test development; not for conformance testing.No values are computed from the vehicle's requests. TLS 1.3 mutual authentication is required.
ISO 15118-20 EVSE Plug & ChargeReference responder driven by a fixture manifest. For engineering and test development.Plug & Charge advertisement requires the fixture manifest variable. No CertificateInstallation or MeteringConfirmation in the live session.
ISO 15118-20 EVCC, AC / BPT / Plug & Charge profilesDry-run, loopback and deterministic simulation.No live session against a third-party charger.
ISO 15118-2 EVSE (DC EIM, AC EIM, AC Plug & Charge, TLS)Reference responder for external vehicles. For engineering and test development; not for conformance testing.Plug & Charge uses fixed engineering certificates. No CertificateUpdate or MeteringReceipt in the live session.
ISO 15118-2 DC EIM session, SECC and EVCC (profiles iso15118_2_dc_eim, iso15118_2_dc_eim_evcc; command iso2-evcc)A full DC EIM session between the ChargeLink SECC and the ChargeLink EVCC over TCP or TLS 1.2, with the shared plant bridge and a current-demand loop.An engineering lane, not for conformance testing. The SECC profile is plant-coupled and needs --plant-grpc-endpoint (the NI VeriStand bench). TLS 1.2 with the cipher suites of ISO 15118-2 on OpenSSL; iso2-pki generates the engineering private-environment identity. No session against a third-party charger is claimed.
DIN 70121 EVSEReference responder for external vehicles. For engineering and test development; not for conformance testing.Answers requests that match the reference request encodings. No TLS.
DIN 70121 DC session, SECC and EVCC (profiles din70121_dc, din70121_dc_evcc; command din-evcc)A full DIN 70121 DC session between the ChargeLink SECC and the ChargeLink EVCC over TCP, with the shared plant bridge and a current-demand loop.An engineering lane, not for conformance testing. The SECC profile is plant-coupled and needs --plant-grpc-endpoint (the NI VeriStand bench); no TLS (DIN 70121 has none). No session against a third-party charger is claimed.
ISO 15118-2 / DIN 70121 EVCC reference profiles (evcc start, evcc activate-profile)Deterministic simulation, loopback and the TLS probe.These profiles transmit ChargeLink's typed framing, not standards EXI; use iso2-evcc and din-evcc for a standards-encoded session against the ChargeLink SECC.
IEC 61851-23/-24 System A, station and EV (dc-can chademo)Both roles with a simulated plant and pilot circuits on a virtual CAN hub or a Kvaser CAN channel; a 29-case matrix, a repeatability run and a combined run on one PC; a two-PC lane.Engineering evidence of the CAN layer, timing and state rules; no vehicle or charger has been tested; no conformance or certification claim; no power stage.
Scripted DC-CAN virtual lanesFixed, pre-scripted lists of CAN fixture frames with a closure simulator on a virtual bus. For engineering and test development.Not a protocol implementation. Adapter kinds are descriptors that open no hardware; hardware mode is an operator attestation. See Scripted DC-CAN Lanes.
Physical charging interfaceNot part of the software.ChargeLink contains no power-line communication or SLAC, control pilot or proximity, physical CAN or power-stage control. The bench provides the physical link. A real powerline (PLC) link to a vehicle or charger is connected through the DEVlink PLC Relay Unit, which is in development; see Connecting to Real PLC Hardware.

For other charging standards, contact DEVlink.

Test, evidence and integration

AreaWhat ChargeLink doesLimits and requirements
Protocol-first test campaigns (test)Discovers test cases, plans and runs campaigns, and writes verdict reports for ISO 15118-2 and ISO 15118-20.PASS/FAIL only from an operator-supplied live-SUT or validated-replay evidence manifest.
Licensed conformance packagesPlanning, entitlement checks and traceability.The package runner emits inconclusive (dry-run) or blocked until evidence is bound; it never reports PASS on its own.
Deterministic simulation and replaySeeded paired simulations with transcript hashes and replay verification.Symbolic transcripts, not wire traffic.
Evidence: manifests, integrity, redaction, support bundleOne run directory per run with SHA-256 manifests, traces and reports."Signed" verdict manifests are SHA-256 integrity seals, not external signatures. No PCAP, CSV, JUnit or PDF output.
gRPC Integration APISession lifecycle, signals, campaigns and evidence for your own automation.The management API is local only: a non-loopback --listen is refused and there is no TLS transport. Every call needs the per-start access token (<state-root>\api-token, bearer header). A session whose configuration carries a "listener" object starts and observes an EVSE listener (bound listener); a listener started from the CLI stays unbound (GetProtocolState = unobserved). A bound listener reports only the first protocol session of its run.
NI VeriStand benchCouples the ISO 15118-20 DC EIM session to a VeriStand plant model (simulated power stage).Requires NI VeriStand 2024 Q4 only. The shipped system definition runs the engine at 500 Hz on Windows and places its loops on logical processors 10, 11 and 12; the package contains no tool to change that placement. The plant is simulated; your own safety controller keeps physical authority over any real equipment.
ASAM XIL, HIL adapter SDK, factory/EOL, enterprise managementDeterministic reference implementations of the orchestration contracts.No NI XIL runtime, physical HIL equipment or production equipment is driven.
OPC UAProbe of an installed OPC Foundation stack.No endpoint is opened.
Engineering TLS material (evse tls-material-init)Generates an Annex B-shaped certificate chain marked "ENGINEERING ONLY" for bench use.The SECC refuses it unless evse start --allow-engineering-tls-identity is given. Never use it in production.
LicensingOffline license files with entitlement gating.valid_until and machine_binding are recorded but not enforced at runtime. There is no online activation service.
InstallationA ZIP package with a SHA-256 manifest.No installer. Servers run in the foreground; there is no Windows service mode, so use your own supervisor.
Physical high-voltage safetyOutside the software.Site procedures, interlocks, DUT limits and lab safety systems remain authoritative.

Package catalogue versus executable reality

A package can contain cases that are not executable in the current environment because PICS/PIXIT excludes them, the entitlement is absent, a certificate path is not configured, physical hardware is absent, or a case is intentionally kept as a blocked audit row. Do not report a smaller executed campaign as "missing cases" until applicability and blockers have been reviewed.

Version-sensitive behaviour

CLI syntax, defaults, package contents, profile IDs and integration dependencies can change between releases. For a controlled procedure: record chargelink --version and the binary hash, archive the selected profile output, archive PICS/PIXIT and campaign inputs, record the documentation version, and never copy a command from a newer manual into an older build without checking --help. Hard-coded defaults such as fe80::640b:3f3d:c4fe:3d9f%19, interface index 19 and TCP 55000 in some engineering commands are laboratory defaults; always pass your own values.

When to contact support before testing

  • Your installed profiles or packages do not match the purchased scope.
  • The installed NI VeriStand version differs from 2024 Q4.
  • A production TLS/Plug & Charge setup requires certificate material not described for your edition.
  • The DUT requires a non-standard network or CAN configuration.
  • You need to make a certification or formal compliance claim based on ChargeLink output.